Concrete entry steps with a broom finish leading up to a Tauranga home
Tauranga & the Western Bay

Concrete Steps Experts in Tauranga

Entry steps, bank steps and deck steps poured to consistent, code compliant dimensions, so nobody catches a toe on an uneven riser. Finished to match the surrounding concrete or paving.

✓Consistent rise and going on every step, no surprises underfoot.
✓Handrail fixings built in during the pour where a rail is needed.
✓Matched finish, broom, aggregate or stamped to suit your home.

Get a price on your steps

Four details is all we need. We get back to you the same working day to book a time that suits.

No obligation and nothing to pay for the quote. We reply the same working day.

Consistent rise & goingHandrail fixings includedMatched finish options
Why dimensions matter

The step you do not notice is the one that was built right

Nobody thinks about steps until one is wrong. A riser that is 20mm taller than the one before it, or a tread that is too shallow to get a full foot on, is exactly the kind of thing that catches a toe, and it happens more often on home built or poorly set out steps than people expect.

We set out every step in a flight to identical dimensions before boxing anything, so the rise and going stay consistent from bottom to top. On the hillier sections around Pyes Pa and Ohauiti, or a steep bank down to a lower lawn anywhere in Tauranga, that consistency matters even more.

Steps get finished to match whatever they connect to, so a new flight looks like it was always part of the driveway or patio rather than an obvious later addition.

Steps we build

01Entry & porch steps, the first thing visitors walk up.
02Bank & garden steps, built into a sloping section.
03Deck & pool steps, matched to timber or paved surrounds.
04Driveway level changes, where a drive steps down to a garage.
05Retaining wall steps, integrated into a wall structure.
Types of steps

Built for where they sit

Entry steps

A short cast flight from a driveway or path up to a porch or front door.

Bank steps

Built into a slope with a retaining element behind each riser to hold the bank.

Deck steps

Concrete steps down from a timber deck, poured to meet the deck framing height exactly.

Pool steps

Finished with extra grip texture, built to work with pool coping and surrounds.

Steps pricing

What steps cost in Tauranga

Priced per step for a standard width flight, supplied and built, GST included.

Standard entry steps

Broom finish, up to 1.2m wide

$250–$350/step

Exposed aggregate or stamped

Matched decorative finish

$300–$400/step

Bank steps with retaining

Integrated retaining behind each riser

$350–$600/step

Small flight minimum

1 to 2 steps, crew and setup included

from $900

What moves the price

Width, height and finish all shift the per step rate.

›Width. A wider flight uses more concrete per step.
›Retaining. Bank steps need a wall structure behind each riser.
›Finish. Exposed aggregate and stamped both add labour.
›Access. Getting concrete and boxing materials to the site.
Get your steps quoted

Indicative pricing only. Subject to change due to many factors (materials, site, access, and more). For an accurate quote, we must come visit your site.

Concrete step nosing edge being hand finished during construction
Getting it right

The rise and going guide we build every flight to

Building code guidance for outdoor steps calls for a rise around 150 to 190mm and a going of at least 280mm, with every step in the same flight built to identical dimensions. A landing is required for a longer flight past a certain total rise.

We set this out with string lines and levels before any boxing goes in, so the finished flight measures the same top to bottom rather than drifting slightly with each step.

Steps questions

What homeowners ask before building steps

If yours is not here, send it through with your quote request and we will answer it straight.

Ask us in the quote form
+What rise and going should outdoor steps be?

Code guidance calls for a consistent rise around 150 to 190mm and a going of at least 280mm. The key word is consistent, uneven steps within one flight are a common trip cause, and we set every step to the same dimensions.

+Do steps need consent?

Simple freestanding ground level steps are often exempt, but steps that are part of a retaining structure, exceed a certain height, or connect to a consented deck or alteration can need consent. We tell you which applies before quoting.

+Can you build steps into a sloped bank?

Yes, common on the steeper sections around Pyes Pa, Ohauiti and parts of the Mount, usually combined with a small retaining element on each riser to hold the bank behind the step.

+Do you fit the handrail too?

We cast in the fixing points during the pour, since retrofitting a rail into finished concrete is messy. The rail itself is usually supplied and fitted by a metalwork or fencing specialist, and we coordinate timing with them.

+Can you match steps to my driveway finish?

Yes. Steps can be finished in the same broom, exposed aggregate or stamped treatment as the surrounding concrete, so they read as one job rather than an obvious later add on.

+Will they crack?

Steps are solid and low surface area compared to a slab, so generally less prone to cracking. The nosing, the front edge of each tread, takes the most wear and is where chipping is most likely over years of use.

+How long does it take?

A short entry flight is often one to two days including boxing, pouring and finishing. A longer bank flight with integrated retaining takes longer, depending on total height and ground conditions.

+Can you add a landing partway up?

Yes, and for a flight climbing more than roughly a metre it is often worth it, both to break up the climb and, depending on total rise, it may be required for a compliant stair.

Where we work

Steps across Tauranga and the Western Bay

Building steps from Katikati through to Te Puke, and everywhere in between.

Tauranga CentralMount MaunganuiPapamoaBethlehemPyes PaWelcome BayOhauitiMatuaOtumoetaiOmokoroaTe PunaKatikatiTe PukePahoia

Get a fixed price on your steps

Free on-site measure up, an itemised quote in writing, and a flight that measures true top to bottom.